Dubňany production hall
Home/Services/Production halls
Offer · Prefabricated halls

Assembled production halls on a turnkey basis

From kick-off to handover. We manufacture the structure ourselves, the foundations are built by our construction division, and we carry out the assembly with our own assembly capacities.

Our projects

Production halls that are already standing

All projects →
Why with us?

We do not make the hall from purchased parts

Own production

We manufacture the structure on our premises. We don't buy it from a subcontractor with a markup.

Construction Division

You do not deal with the foundations and construction part with another company. We have our own capacities.

Custom assembly

They assemble our assembly groups. You are not waiting on the waiting list of an external assembly company.

Machine park

Mobile cranes, platforms, earthmoving equipment. Without rent and surcharge.

Steel or concrete

When to choose a steel hall

We build most often

A steel hall is suitable when…

✓you want to build fast ✓you need a span without columns ✓you will expand the hall ✓it is a small to medium hall

A concrete hall is suitable when…

✓you are building over 3,000 m² ✓you need high fire resistance

We build both, so we advise according to the assignment, not according to what we can do.

Comparison of steel vs. concrete →
Technical equipment

What we deal with in the production hall

Crane runway

Overhead cranes 1–20 t. We dimension the structure and foundations for the crane already in the project — additional reinforcement is always more expensive.

Insulation and cladding

PUR/PIR sandwich panels. For heated operations, a thickness of 100-150 mm is the standard today.

Enlightenment

Light strips and skylights save lighting and allow ventilation. We solve the trade-off with heat loss.

The floor

We design the composition according to the load on the machine and the movement of the carts. Including reinforcement under the heels and drop.

Gate and entrance

Sectional doors according to vehicles. For frequent entry, high-speed pays off — less loss, less downtime.

Construction of background

Offices, changing rooms and social facilities as part of the hall, not an additional extension.

Technical parameters

Usual values of our halls

Span without internal columnsup to 30 m
Claddingsandwich panels PUR/PIR 60–200 mm
Ground clearance4-12 m depending on traffic and crane
Building footprintfrom 200 m² to thousands of m²
Crane runway1-20 t, bridge and cantilever
Materialsteel with metallurgical certificate, blasted to Sa 2½
34years in the field
100+completed constructions
3generation of family business
CR + SKwhere we build
Photogallery

Close up of the production hall

Click to enlarge
Production hall BulharyBřezí WineryProduction hall HoličProduction hall BřeclavWinery Ševčík BořeticeHall extension Velké PavloviceKovoSmetana showroom, Uherčice — entrance to the premisesPackung warehouse in Horní VěstoniceProduction hall, KobylíPřibice - Kovo Solil
Pricing

How much does the production hall cost?

10 000 – 12 000CZK/m² construction with cladding and assembly
4 000 – 6 000CZK/m² base plate
Price breakdown and examples → The price is most influenced by the size, height, crane path and the condition of the subsoil.
Production and storage hall Starovičky Own production of steel structures in the KovoSmetana complex in Uherčice
Frequently asked questions

What other investors are asking

Didn't find the answer?

Call us right away

We can handle technical and price questions over the phone in a few minutes.

Bc. Tereza Sedláková
Bc. Tereza Sedláková
Sales manager
+420 732 571 681
Romana Škorpíková
Romana Škorpíková
Sales department
+420 734 790 546
Opening hours
Monday-Friday7:00–17:00
Saturday–Sundayclosed
Or visit our showroom for free →

Let’s discuss your project

All you need is a plot of land and an idea of ​​what you will do in the hall. We'll solve the rest together — we'll get back to you within 24 hours. And if you want to see it live first, come and see us in Uherčice.

Jaroslav Smetana Jaroslav Smetana
Managing director
Jakub Smetana, managing director of KovoSmetana Jakub Smetana
Managing director · production
Ing. Tomáš Smetana Ing. Tomáš Smetana
Managing director · marketing

What are you looking for?

Enter at least 2 characters.

Menu
Request a quote →
Call us+420 737 918 106

Choose your language

ČeštinaEnglishDeutsch
Showroom Uherčice

Booking a showroom tour

We will show you a sample hall, the construction up close and the materials we build from. The tour lasts about an hour and there is no obligation.

We will confirm your preferred date or suggest the next available appointment.
We'll get back to you within 24 hours. No spam, no newsletter.
Request a quote

Request a hall quotation

Three steps, two minutes. None of this is binding — the more you tell us, the more accurate the quote you'll get.

  1. 1 Hall parameters
  2. 2 Additional information
  3. 3 Contact
What hall do you need?
Clear height beneath the roof truss.
Hall insulation
We'll get back to you within 24 hours. No spam, no newsletter.