Investor guides
Before you start building
Articles for investors who are building a hall for the first time. Concrete or steel, foundations, casing, crane runway, deadlines — without marketing, from the experience of over a hundred constructions.
Investor guides
How to build a hall on a sloping site
Flat land is an exception. It practically does not exist in agricultural and wine-growing buildings — and even in industrial zones they are usually built on a slope.
3. 9. 20263 min reading
Investor guides
PIR, PUR or mineral wool — what panel for the hall
The cladding of the hall consists of a sandwich panel: two steel sheets and an insulating core between them. The difference between the panels is not in the sheet metal — it is in…
3. 9. 20263 minutes
Investor guides
How long does it take to build a hall
You will get an answer to this question from most suppliers "in three months". It's true — and at the same time the least helpful answer you can…
3. 9. 20262 minutes
Investor guides
Crane track in the hall
The crane runway is not a piece of equipment that can be added to the hall. It is a design parameter of the entire building — and it is decided before,…
11. 8. 20263 minutes
Investor guides
Steel blasting to grade Sa 2½
A coating on a steel structure will only last as long as the surface underneath. You can buy the most expensive paint system on the market —…
14. 4. 20253 minutes
Investor guides
Photovoltaics on the roof of the hall
Today, photovoltaics on the roof of the hall is not a question of "if", but "when". And it is the word "when" that decides how much it will cost you.
17. 3. 20252 minutes
Investor guides
Concrete or steel hall? How to choose
Are you planning a hall and are faced with the first fundamental question: concrete or steel?
5. 3. 20253 minutes
Investor guides
Make your ideas come true in the new hall configurator
It couldn't be simpler! Make your ideas come true in the new hall configurator We present a revolutionary way to request a steel hall exactly according to your…
31. 1. 20252 minutes
Investor guides
Prefabricated halls on a turnkey basis
"Turnkey hall" is a phrase that almost every supplier has on the web. But it means something different to everyone — and you can tell the difference...
30. 1. 20253 minutes
Investor guides
Hall heating: floor heating or gas radiators?
Heating the hall is an item that is paid for every winter for the next thirty years. And a major decision about her will be made before you know it...
23. 1. 20252 minutes
Let’s discuss your project
All you need is a plot of land and an idea of what you will do in the hall. We'll solve the rest together — we'll get back to you within 24 hours. And if you want to see it live first, come and see us in Uherčice.
Jaroslav SmetanaManaging director
Jakub SmetanaManaging director · production
Ing. Tomáš SmetanaManaging director · marketing