We have completed the construction of a steel footbridge over the Litava River
We are proud to announce that our company has successfully completed the construction of a steel bridge over the Litava River, which is located in an important location connecting the city and the planned access road to the LIDL store.
The footbridge measures 33 meters in length, 3 meters wide and its total weight reaches 12 tons.
We used it during assembly crane with a capacity of 200 tons, which was crucial for the accurate seating of the structure. The whole process required professional coordination of two teams, to ensure smooth installation and maximum safety.
Currently, the footbridge serves as product pipeline, while in 2025 will be supplemented with walking grates and railings, turning it into a full-fledged one connecting footbridge between the city and the LIDL store.
This project is further proof of our expertise and ability to implement technically demanding buildings from steel structures. If you are looking for a reliable partner for similar projects, we are here for you.
You can watch the installation process in the video below, which captures not only the technical requirements of the project, but also the work of our team.





