Investor guides

Prefabricated halls on a turnkey basis

"Turnkey hall" is a phrase that almost every supplier has on the web. But it means something different to everyone — and you will only know the difference when you are standing on a construction site under construction and deciding who should have made the connection.

30. 1. 2025 3 minutes of reading KovoSmetana
Prefabricated halls on a turnkey basis

"Turnkey hall" is a phrase that almost every supplier has on the web. But it means something different to everyone — and you will only know the difference when you are standing on a construction site under construction and deciding who should have made the connection.

Here's what a turnkey delivery should actually include.

What is included in the turnkey delivery

Phase What is happening in it
Consultation and proposal detection of operation, disposition, indicative price
Project and engineering activity documentation, discussion, building permit
Earthworks and foundations excavations, footings, passes, or piles
Steel construction production in the workshop, surface treatment, transport
Assembly staffing the structure with own squads
Cladding walls, roof, sheet metal flashings
Hole fillers doors, windows, doors, skylights
Floors and hard surfaces concreting, reinforced concrete, communication
Handover document part, revision, warranty

If any of those items are missing from the menu, it is not a turnkey delivery. It is a delivery of the structure and the rest you will take care of yourself.

Why one supplier instead of five

Margins between companies will disappear. For split delivery, each link in the chain adds its own surcharge. When one company does the same with its own capacities, this cost does not exist. Downtime at the work interface will disappear. The most expensive days on a construction site are those when nothing happens because one company is waiting for another. With one delivery, the order of work is planned as a whole. The question of "whose fault is it" disappears. When the foundations are made by one company and the construction by another, and the anchor points do not match, the arguing begins. When both are supplied by one, the question does not arise. That leaves one deadline and one responsibility. An investor deals with one contract, not five schedules.

How long does it take

The assembly time of the hall ranges from thirty days. It's not a miracle, it's a consequence of technology: the steel structure is produced in the workshop while the foundations are on site. Finished parts will arrive at the construction site.

Contracts where the substructure is also included in the delivery tend to be longer — earthworks, foundations and communications will add weeks.

What to ask each supplier

  1. Who makes the foundations? If another company, who is responsible for ensuring that the anchorage fits?
  2. Who controls building permits? Engineering is a job for months.
  3. Do you have your own assembly crews or do you hire? The external team works according to their waiting list, not according to your deadline.
  4. What design class do you supply?
  5. What is the warranty? And what exactly does it apply to?
  6. How many similar builds have you completed? And is it possible to go see them?

what we do

We are general contractor with its own production, construction division and assembly teams. In thirty-four years and three generations, we have built over 100 buildings in the Czech Republic and Slovakia.

Non-binding inquiry or try the hall configure.

Services

Where to look next

Let’s discuss your project

All you need is a plot of land and an idea of ​​what you will do in the hall. We'll solve the rest together — we'll get back to you within 24 hours. And if you want to see it live first, come and see us in Uherčice.

Jaroslav Smetana Jaroslav Smetana
Managing director
Jakub Smetana, managing director of KovoSmetana Jakub Smetana
Managing director · production
Ing. Tomáš Smetana Ing. Tomáš Smetana
Managing director · marketing

What are you looking for?

Enter at least 2 characters.

Menu
Request a quote →
Call us+420 737 918 106

Choose your language

ČeštinaEnglishDeutsch
Showroom Uherčice

Booking a showroom tour

We will show you a sample hall, the construction up close and the materials we build from. The tour lasts about an hour and there is no obligation.

We will confirm your preferred date or suggest the next available appointment.
We'll get back to you within 24 hours. No spam, no newsletter.
Request a quote

Request a hall quotation

Three steps, two minutes. None of this is binding — the more you tell us, the more accurate the quote you'll get.

  1. 1 Hall parameters
  2. 2 Additional information
  3. 3 Contact
What hall do you need?
Clear height beneath the roof truss.
Hall insulation
We'll get back to you within 24 hours. No spam, no newsletter.