Drásov production hall
In Drásov, we are building a 20 x 42 m warehouse with a 12 x 15 m floor extension for offices and facilities for the company Bibetus s.r.o., which deals in the sale of electrical appliances.
- Year completed
- 2026
- Client
- Bibetus s.r.o.
- Client’s industry
- sale of electrical appliances
- Location
- Drásov
What exactly did we build?
About the project
Electrical appliance warehouse with offices above the operation. The Bibetus hall is 20 x 42 m and has a built-up area of 840 m².
- Floor plan: The 12 x 15 m floor plan provides 180 m² per floor for offices and facilities. It includes a steel staircase and a trapezoidal T 55 ceiling with a thickness of 0.8 mm with a concrete slab.
- Light above the shelves: Skylights 4 x 6 m and 4 x 12 m bring daylight into the center of the warehouse, where the side glazing is shaded by shelves.
- Editing during preparation: The number of facade windows was reduced from ten to five; overhead lighting took on a greater role.
- Casing and steel: PIR panels 120 mm in RAL 9002 are complemented by a vapor barrier foil. S235 and S355 steel construction is in EXC2, with polyurethane coating.
The two skylights have a total of 72 m² and illuminate the warehouse directly from above.
Call us right away
We can handle technical and price questions over the phone in a few minutes.
Gallery
Similar buildings
Storage halls
Large spans without columns, loading docks, racks.
→
Production halls
Crane runways, built-ins, floors for heavy traffic.
→
Office buildings
Shops, showrooms, multi-storey facilities with glazing.
→
Production · Bulgarians · 2025
Production hall Bulhary
Dvr Exhaust, s.r.o.
→
Administrative · Rosice u Brno · 2024
Sales and storage facility Rosice
Private client
→
Production · Dubňany · 2025
Dubňany production hall
Private client
→
Do you need a similar hall? Check out ours production halls or calculate the price in configurator.
The best reference is one you can walk through.
We built our own premises ourselves — and it is also a showroom for everything we offer. Not a sample room with bits of panel on the wall, but a real hall in day-to-day operation that you can see from the foundations to the sheet metal work.
The tour is free and does not obligate you to anything. Upon agreement, we will also take you to the finished construction of one of our customers.

















Let’s discuss your project
All you need is a plot of land and an idea of what you will do in the hall. We'll solve the rest together — we'll get back to you within 24 hours. And if you want to see it live first, come and see us in Uherčice.
Jaroslav SmetanaManaging director
Jakub SmetanaManaging director · production
Ing. Tomáš SmetanaManaging director · marketing































