
Footbridge and product pipeline
As a subcontractor of ESOX spol. s.r.o. in 2024, we produced and assembled a steel footbridge over the river in Židlochovice.
- Year completed
- 2024
- Client
- ESOX spol. s r.o. (subdodávka)
- Location
- Židlochovice
- Purpose
- footbridge across the river, connecting the LIDL shopping center with urban development
What exactly did we build?
About the project
Thirty-three meters across the river in a single stroke. A 3 m wide footbridge connects the new LIDL shopping center with the urban area.
- Three parts due to zinc plating: The individual parts were made in the dimensions of the galvanizing bath. After hot-dip galvanizing, they were joined on the shore into the finished footbridge.
- Assembly as a whole: The mobile crane installed the structure on both supports at once, without mounting supports in the flow. Both the geometry and the attachment points had to take into account a different load during lifting than during normal operation.
- Protection of public buildings: Hot-dip zinc protects the steel against rain, road salt and minor surface damage.
The entire implementation took one month; assembly on the ground shortened the work above the river and helped meet the center's opening deadline.
Call us right away
We can handle technical and price questions over the phone in a few minutes.
Gallery
Similar buildings
Steel structures · Křenovice / Měrovice nad Hanou, Přerov district · 2025
Steel bridge
M-Road
→
Steel structures · Popůvky near Brno · 2023
Connecting bridge Brno
JAPO Transport a.s.
→
Steel structures · Brno, embankment of the river Svratka · 2025
Brno embankment
OHLA Elementary School, FIRESTA
→
Do you need a similar hall? Check out ours production halls or calculate the price in configurator.
The best reference is one you can walk through.
We built our own premises ourselves — and it is also a showroom for everything we offer. Not a sample room with bits of panel on the wall, but a real hall in day-to-day operation that you can see from the foundations to the sheet metal work.
The tour is free and does not obligate you to anything. Upon agreement, we will also take you to the finished construction of one of our customers.

















Let’s discuss your project
All you need is a plot of land and an idea of what you will do in the hall. We'll solve the rest together — we'll get back to you within 24 hours. And if you want to see it live first, come and see us in Uherčice.
Jaroslav SmetanaManaging director
Jakub SmetanaManaging director · production
Ing. Tomáš SmetanaManaging director · marketing

















