Steel mezzanine Svárov
For INVOS spol. s.r.o. in 2021, we produced and assembled a four-story steel building weighing 120 tons.
- Year completed
- 2021
- Client
- INVOS spol. s r.o.
- Location
- Svárov
- Purpose
- supporting structure for the production of food films
What exactly did we build?
About the project
Four floors of technology inside the finished building. A steel structure weighing 120 tons carries equipment for the production of food films.
- Dimensions and use: Four floors on a floor plan of approximately 25 x 15 m form the supporting structure for the production technology.
- Installation behind a closed roof: All the pieces went through the existing holes. Inside, they were mounted by small crawler cranes; it was not possible to open the roof or lower the structure from above with a truck crane.
- Construction according to access routes: The size, weight and order of the parts have adapted to the limited space. After the connection, they had to safely support all four floors.
The biggest challenge: getting 120 tons of steel inside and assembling it without opening the roof.
Call us right away
We can handle technical and price questions over the phone in a few minutes.
Gallery
Similar buildings
Hall fit-outs
More usable floor space without extending the hall or taking up additional land.
→
Industrial steel structures
Conveyors, service gangways, platforms, supporting frames.
→
Steel structures
Footbridges, bridges, stairs, atypical welded joints.
→
Steel structures · Štramberk · 2021
Exhaust chimney Štramberk
Innogy Gas Storage
→
Steel structures · Brno, Rybnická · 2023
Steel mezzanine Brno Rybnická
Private client
→
Steel structures · Hustopeče · 2022
Covered automated racking Hustopeče
Westphalia
→
Do you need a similar hall? Check out ours production halls or calculate the price in configurator.
The best reference is one you can walk through.
We built our own premises ourselves — and it is also a showroom for everything we offer. Not a sample room with bits of panel on the wall, but a real hall in day-to-day operation that you can see from the foundations to the sheet metal work.
The tour is free and does not obligate you to anything. Upon agreement, we will also take you to the finished construction of one of our customers.

















Let’s discuss your project
All you need is a plot of land and an idea of what you will do in the hall. We'll solve the rest together — we'll get back to you within 24 hours. And if you want to see it live first, come and see us in Uherčice.
Jaroslav SmetanaManaging director
Jakub SmetanaManaging director · production
Ing. Tomáš SmetanaManaging director · marketing